These outline the façade – the character for the development of the Sandown Commercial Precinct. The purpose of the design guideline is to ensure that the incremental development of the precinct creates a harmonious and functional urban environment along Sandown Road, as part of the Sandown Development. These guidelines have been approved by the City of Cape Town.

These have been prepared in the form of architectural controls for the erven zoned Single Residential Zone 1 (SR1). These controls read together with the National Building Regulations and the City’s Integrated Zoning Scheme, all of which apply and will guide the top structure development of homes in Sandown. These guidelines are managed by the developer.

Following the launch of the first security estate, Sagewood, Sandown will offer monitoring of residential areas with the assistance of Avid Security who will provide a vehicular patrol and a response backbone. Cameras will be stationed at intersections accessing the development. Together with these security measures, the layout, landscaping and urban character of the Sandown development will reflect the upmarket image of the suburb.

A fibre network will provide the telecommunications network to Sandown that supports not only the latest technology but allows for various services to be carried over the network. This fibre infrastructure will support end-user consumer services, allowing for security networks to be connected by providing connection to the cameras, contributing to future-proofing, expansion and growth.

The high standard of top structure and development has already been set by the Parklands College (Sandown Campus) and it is encouraged that the design of the residential units should follow on with this principle.

CONTACT

Constitution Download

Sandown POA Constitution – Download

COMMERCIAL PRECINCT DOWNLOADS

Sandown Commercial Precinct Urban Design Guidelines  | Download here
Sandown Mixed Use Node Design Guides  | Download
ERF 454 (Candlewood) LUM Approval – Download
Sandown Phases 1C & D erven 610 & 800(Cedar Square) – Download
Sandown Commercial Bulk Register – Download

SINGLE RESIDENTIAL DOWNLOADS

Annexure “A” The diagram for Phase 1A – Download
Annexure “A” The diagram for Phase 1B – Download
Annexure “A” The diagram for Phase 1C and 1D – Download
Annexure “B” Plan of the Development – Download
Annexure “C” Single Residential Architectural Controls, the GUIDE  –Download
Annexure “C-1” Diagram recording the residential types  – Download
Annexure “C-2” Colour Chart  – Download page 1  |  Download page 2

Annexure “C-4” Sandown Plant List – Download
Annexure “D”  Sandown Contractors Conduct Agreement – Download
Approved Diagram Phase 1C – 1 – Download
Approved Diagram Phase 1C – 2 – Download
Contractors Sign – Download
Landscape Master Plan for Phases 1A and 1B – Download
Introductory letter – Design Review Process – Download
LIME Introductory letter – SPOA Management Company – Download
Services – Phase 1C-1 – Download
Services – Phase 1C-4 – Download
Sandown Phase 1C, D Access – Download

Phase 5 & 6

Annexure “C” Single Residential Architectural Controls, the GUIDE  –Download
Plot Size Layout ( Annexure A ) – Download 
Landscape Framework Plan – Download

Phase 5A SG Diagram- Download
Phase 5B SG Diagram –
Download
Phase 5C SG Diagram – Download
Phase 5D SG Diagram- Download
Phase 5E SG Diagram – Download
Phase 6A SG Diagram- Download
Phase 6B SG Diagram – Download
Phase 6C SG Diagram – Download
Phase 6D SG Diagram – Download

Phase 6E SG Diagram – Download

CONSTRUCTION ENVIRONMENTAL
MANAGEMENT PLAN

CEMP – Rev 1 January 2020 – Download

Letter of Approval – CEMP for top structures – Download

GENERAL RESIDENTIAL GUIDELINES

Annexure A – Diagram (Cedar Street Precinct) – Download
Annexure B – Plan of development – Download
Annexure C – The Guide – Download
Annexure D – City of Cape Town, Conditions of Approval – Download
Annexure E – Annexure E-Construction Enviromental Management plan – Download
Annexure F – Stormwater Management Requirements – Download
Annexure G – Landscape Master Plan (Cedar Street Precinct) – Download
Cedar Square Precinct – Draft Services Diagram – Download
Conditions of Approval – 6 September 2018 – Download
Sandown General Residential Design Review Process & Fees – Download

SAGEWOOD

Annexure “B” Plan of the DEVELOPMENT  |  Download here
Annexure “C” Single Residential Architectural Controls, the GUIDE  –Download
Annexure “C-1” Diagram recording the residential types  |  Download here
Annexure “C-2” Colour Chart  |  Download page 1  |  Download page 2
Annexure “C-4” Sandown Plant List  |  Download here
Annexure “D” Sagewood Contractor’s Conduct Agreement  |  Download here
CEMP – Rev 1 January 2020 | Download here
Contractor Sign – Dimensions 600mm x 1000mm  | Download here